Customer stories

Shipping got faster the week they switched

Three engineering teams, three different stacks. The same result: smaller releases, shipped more often, rolled back in seconds when needed.

  • Ostrelo's storefront team moved 40 services from a self-hosted CI to Rivetlane in three weeks, and gave every pull request its own preview URL.

    Reviewers click a preview link instead of pulling branches. Our designers now sign off on real builds, not screenshots.

    AY

    Aiko Yamamoto

    Engineering Manager

    Median build time
    14 min52 s
    Deploys per day
    341
    Time to roll back
    25 min9 s
    Read the Ostrelo story
  • Zephlo's platform team replaced weekly release trains with continuous deploys after instant rollbacks made a bad release a non-event.

    We stopped scheduling release nights. A bad deploy is one click away from the last good one, so we just ship.

    MR

    Mateo Rossi

    Head of Platform

    Releases per week
    160+
    Change failure rate
    18%4%
    Read the Zephlo story
  • Talvik serves shoppers in 14 countries. Moving its storefront to Rivetlane's edge network cut page loads worldwide without a rewrite.

    Edge caching was a config line, not a project. Our checkout got faster in every region the same afternoon.

    NH

    Nadia Haddad

    Staff Engineer

    p75 page load
    2.8 s0.9 s
    Infra cost per month
    $18.4k$7.1k
    Regions served
    214
    Read the Talvik story